Two-level deck with white railings and stairs to the yard

Custom Decks

Composite decks on footings and framing built to last as long as the boards on top.

Contact Us

A deck is only as good as what holds it up. The boards get the attention, but the footings, the ledger where the deck meets the house and the framing underneath decide whether it stays solid for decades or starts to bounce in a few years.

We build new decks and replace worn-out ones across Loudoun County and western Fairfax. Many neighborhoods here were built from the late 1980s through the 2000s, and the original builder decks on those houses are reaching the end of their life.

What We Build

  • Single-level and multi-level decks
  • Second-story decks with stairs to the yard
  • Decks that step down to a paver patio
  • Decks with a roof, or framed to be screened in later
  • Wide stairs, landings and built-in benches

Materials

Part What we use
Decking Trex composite, most often the higher-end Transcend line, TimberTech and Deckorators
Framing Pressure-treated lumber, sized and spaced for the span
Railings RDI railings, and aluminum railings with aluminum pickets
Fascia and risers PVC boards that will not rot

How do I know my old deck needs replacing?

Look underneath, not on top. Gray or splintered boards are a surface problem. A ledger board pulling away from the house, posts that have rotted at the ground, joists that sag, or railings that move when you lean on them are structural problems, and they mean the frame has reached its end. A ledger separating from the house is the most serious of these and is worth a call the week you notice it.

What Goes Into the Structure

  • Footings dug to frost depth and inspected before framing
  • A ledger board bolted to the house and flashed to keep water out
  • Joists and beams sized for the span, with hardware rated for outdoor use
  • Stairs and railings built to the current Virginia building code

Which composite brand should I choose?

We build most decks with Trex, usually its higher-end Transcend boards, and we also build with TimberTech and Deckorators. Every major brand offers several lines, from a basic board to a capped premium board with deeper color and better resistance to fading and stains. We bring samples to the estimate and show you how each looks against your siding and trim, since a board that looks right in a showroom can look different next to your house in full sun.

White deck and covered porch with stairs on a two-story house
Deck with white railings above a stone patio and walkway
Wood deck with a mosaic table and an outdoor rug

How Your Deck Gets Built

  1. Design visit. We measure the house and yard, check the grade and talk through size, levels, stairs and railings.
  2. Written proposal. You get a drawing, the materials list and a firm price in writing.
  3. Permit and HOA. We file the county permit and give your HOA the plans and product information it asks for.
  4. Footings and framing. Footings are dug and inspected, then the ledger, beams and joists go in and the framing is inspected.
  5. Decking, railings and cleanup. Boards, railings, stairs and trim go on, the final inspection is scheduled and the site is cleaned up.

What about the space under the deck?

Plan it with the deck. Under a second-story deck there is room for a stone patio, a seating area out of the sun, or a spot for the grill. If you might want a patio there later, tell us at the design visit so the posts land where they will not be in the way and the grade underneath is set for drainage.

Frequently Asked Questions

Do you repair old decks?

JK General Contractor focuses on new decks and full replacements. When a deck's footings or framing are failing, replacing the whole structure is usually a better investment than patching the boards on top.

Composite or wood?

Most of the decks JK General Contractor builds use Trex composite boards, often the higher-end Transcend line, and we also build with TimberTech and Deckorators. Composite costs more up front than pressure-treated wood but do not need sanding, staining or sealing. The framing underneath is pressure-treated lumber either way.

Do I need a permit for a deck?

Most decks attached to a house need a county building permit, with inspections of the footings, the framing and the finished deck. JK General Contractor prepares the plans and handles the permit.

How long does a new deck take?

Most decks take JK General Contractor one to two weeks on site once the permit is issued. Multi-level decks, roofed decks and decks with stairs down to a patio take longer.

Can the deck be built so I can screen it in later?

Yes. JK General Contractor can size the footings, posts and beams for a future roof, so a screened porch can go on top later without rebuilding the structure.

Call Contact Us