Patios and Hardscapes

Stone and paver work built on a solid base by our own masons.

Contact Us

Hardscaping is the stone side of outdoor living: the patio you set the table on, the wall that holds back the slope, the fire pit everyone gathers around, the walk from the driveway to the door.

What makes it last is mostly out of sight. Our patios are laid over a 4-inch slab of concrete from Capitol Concrete, pitched so rain runs off toward the yard and not the foundation, and the edges are restrained so pavers stay put. Walls get drainage stone and pipe behind them, and heavy features like fireplaces and kitchen islands sit on footings or reinforced bases.


Pavers or natural stone?

Both last when the base under them is right, so the choice comes down to look, budget and upkeep.

  • Concrete pavers from Techo-Bloc and Belgard come in a wide range of colors, sizes and textures, and a section can be lifted and reset
  • Flagstone gives a natural, irregular or square-cut surface with a look no paver matches
  • Travertine is a smooth, light stone that suits pool surrounds
  • Clay brick fits older colonials and works well as a border
  • Mixed borders, a band of one material framing a field of another

We bring samples of each to the estimate, because a color on a screen and a stone in your hand in your own yard are two different things.

What makes a patio stay flat?

The base and the water. A patio that sinks or tilts almost always has a soft spot below it or water sitting under it. That is why our patios go on a 4-inch concrete base instead of loose soil, with the slab sloped away from the house. Edge restraints keep the outer rows from creeping, and polymeric sand locks the paver joints.

Which features turn a patio into an outdoor room?

The features that give people a reason to stay outside: something to cook on, something to sit around, and something to sit on.

  1. An outdoor kitchen with a stone grill island and counter seating (outdoor kitchens)
  2. A fire pit or fireplace with a seating wall around it (fireplaces and fire pits)
  3. Seating and retaining walls that give the patio an edge and level a slope (walls)
  4. A walkway and steps that tie the patio back to the house and the driveway (walkways)

Each one can be part of the first project or added later. Telling us at the start lets us leave the right base and run the gas or power before the stone goes down.

How do we handle a sloped yard?

Most Northern Virginia backyards slope, and that shapes the plan. A gentle slope can be graded into a flat patio with a low seating wall on the downhill side. A steeper one may call for a retaining wall and steps, or two patio levels joined by wide treads. Taller walls get reinforcement in the soil behind them and an engineered design where one is required, and we arrange that engineering.

Combine With a Deck or Porch

Patios often sit under or beside a deck or screened porch. Our carpenters can build the deck or screened porch in the same project, so the levels, steps and drainage are planned together. A patio under a deck also needs its own drainage plan, since the deck boards let rain straight through onto the stone. See Porches and Decks for the carpentry side, and Additions and Remodeling for work inside the house.

Frequently Asked Questions

What is hardscaping?

Hardscaping is the built stone and masonry part of a yard, as opposed to the plants and lawn. JK General Contractor builds patios, walkways, steps, retaining and seating walls, fire pits, outdoor fireplaces and outdoor kitchens.

Do I need a permit for a patio?

A ground-level patio usually does not need a building permit, but most HOAs want to approve it, and retaining walls, raised patios and gas lines can change the answer. JK General Contractor checks your county and HOA rules at the estimate.

Can I add a fire pit or kitchen to the patio later?

Yes, and it is easier if JK General Contractor knows about it when the patio is built. A spot can be left with a stronger base, and the gas or power line can be run under the stone before it goes down.

How long does a patio project take?

Most patios take JK General Contractor's masons a few days to two weeks on site, depending on the size, the digging and any walls or steps. A fire pit adds a few days, and a full fireplace takes one to two weeks.