Kitchen Remodeling in Ashburn, Chantilly and Centreville

Kitchens designed and priced in writing before work starts, with licensed plumbers and electricians under their own permits.

Contact Us

Who remodels kitchens in Ashburn and Chantilly, VA?

JK General Contractor, a Virginia Class A contractor (No. 2705135143), remodels kitchens in Ashburn, Chantilly and Centreville. The design comes first, then one firm price in writing after the site visit, and a single project manager sees the job through, from the first meeting to the final walkthrough. Licensed plumbers and electricians work under their own permits, and JK files the county building permit when the work needs one and schedules the inspections.

A kitchen remodel brings a lot of trades into one room: a plumber for the sink and the dishwasher, an electrician for the lights, the outlets and the appliance circuits, often a gas line for the range, and a range hood that may need a duct to the outside. JK General Contractor runs it as one job, with the design settled before the old kitchen comes out.

We take on remodels, not small repair jobs. A kitchen can be a project of its own, or one part of a bigger one, such as an addition that gives it more floor or a kitchen and a bath done together. Kitchens are one part of our home remodeling work.

What we remodel

  • Kitchen remodels: the kitchen you have, remodeled in the room it is in now
  • Bigger kitchens: a bump-out or a room addition that adds floor, built as part of the same project
  • Kitchen and bath together: a kitchen and a bathroom remodeled in one project, with one project manager
  • Kitchenettes and wet bars downstairs: built as part of basement finishing

How a kitchen remodel runs

It starts at the house. We look at the kitchen with you and talk through what you want to change and what should stay, and the design comes first, so the layout and the scope are settled before there is a price.

Then you get one firm price in writing after the site visit, a single number rather than a range.

The work is done under our Virginia Class A license, No. 2705135143. When it needs a building permit, JK General Contractor draws the plans, files the permit with the county and schedules the inspections. The licensed plumber and electrician pull permits for their own work, and if the range runs on gas, a licensed trade runs the gas line under permit while we coordinate it with everything else.

One project manager is your contact from our first meeting to the final walkthrough, so you have one person to ask about any part of the job.

Remodel in place or make room?

Option What changes Worth knowing
Remodel in place The kitchen is redone in the room it has Keeping the sink, range and refrigerator where they are keeps plumbing, gas and wiring changes small
Bump-out One wall of the kitchen moves out Built as an addition, with the siding, trim, windows and roofing matched to the house
Room addition The kitchen grows into new space beside it Footings inspected before the concrete goes in, and the new roof tied in and flashed
Kitchen and bath Two rooms in one project The bathroom is rebuilt from the studs out

If the kitchen itself works and what you are missing is a bright place to sit next to it, look at a sunroom instead.

Thinking about a kitchen remodel?

Send us a few lines about your kitchen, and we will set a time to come and see it.

(571) 437-2511Contact Us

Where We Remodel Kitchens

For a kitchen, JK General Contractor draws the plans and, when the work calls for a building permit, files it with the county the house is in, whether Loudoun, Fairfax or Prince William, then books the inspections. A kitchen remodel that changes the outside of the house, such as a new window or a vent through a wall, can also need your HOA's approval, and its board gets product sheets, samples and drawings from us.

How much does a kitchen remodel cost?

It depends on how much changes. These are the things that move it:

  • The room: its size, and how much of it is redone
  • Layout: moving the sink, the range or the refrigerator moves plumbing, gas or wiring with it
  • Walls: opening or taking out a wall, above all one that carries weight from above
  • Selections: the cabinets, counters, flooring, fixtures and appliances you choose
  • Electrical: new circuits, lighting and the outlets the code calls for along the counters
  • Ventilation: a range hood ducted to the outside
  • More floor: a bump-out or an addition brings its own design, engineering and permit
  • Permits: the building and trade permits the work calls for, and their inspections

What not to do in a kitchen remodel

Do not take out a wall before you know what it carries. Some kitchen walls hold up the floor or the roof above them. Taking one of those out means a beam sized for the load and a building permit for the work, so it belongs in the design, not in the middle of demolition.

Do not leave the appliances for last. The range, the refrigerator and the dishwasher set the openings the rest of the kitchen is built around, so choose them while the layout is being drawn.

Kitchen and bath remodeling in one project?

Yes. We remodel kitchens and bathrooms, and when both are on your list they can run as one project, with one written price and one project manager. Bathrooms have a page of their own, bathroom remodeling.

Do I need a permit to remodel a kitchen?

Usually, yes. A new circuit, a moved drain, a new gas line or a wall that comes out each brings a permit and an inspection; work that only replaces finishes may not need one, and the county makes that call.

Where the house sits decides which county. In Chantilly that takes a look at the address: most of the 20151 ZIP code is in Fairfax County and much of 20152 is in Loudoun County, and each county runs its own permit office. Ashburn homes go to Loudoun County and Centreville homes to Fairfax County.

Frequently Asked Questions

How soon can you come look at my kitchen?

We return calls the same or the next business day, and the first visit usually follows within a few days. The estimate is free and done at the house. A kitchen is inside work, so winter does not hold it up the way it can hold up a patio or a deck.

What should I ask kitchen remodelers before hiring one?

Ask which permits the work needs and who pulls each one: the building permit when a bearing wall comes out, and the plumbing, electrical and gas permits for the trades. Ask for the Virginia license class and number as well, and look it up on the DPOR website. Our answers: JK General Contractor files the building permit, licensed trades pull their own, and our license is Class A, No. 2705135143.

Can you make my kitchen bigger?

Yes, by building out. A bump-out moves one wall of the kitchen outward; a room addition gives it new space beside it. Either one can be planned and priced with the remodel. Outside, the siding, trim, windows and roofing of the new part are matched to the house.

Do you take small kitchen repairs?

No. JK General Contractor takes on kitchen remodels and the additions that make kitchens bigger, not small repair jobs such as a dripping faucet or a loose cabinet door. If a repair is all you need, a plumber or a handyman is the quicker call.

Call Contact Us